Selected work

Major orders completed.

A snapshot of rehabilitation, CFRP lining and structural repair work delivered across the Kingdom's industrial sites.

From the Field

Real field documentation from live rehabilitation work

Direct captures of our crews executing CFRP wrapping, tank lining, pipeline reinforcement and waterproofing inside live industrial facilities.

CFRP Pipeline Wrap
CFRP Pipeline Wrap
Live in-service pipeline repair — no hot work, zero production shutdown.
Before Repair
Before Repair
Corroded process pipe prior to intervention — engineered per ASME PCC-2.
Defect Survey
Defect Survey
Documenting defects inside industrial tanks & pipes before designing the repair system.
Concrete Waterproofing
Concrete Waterproofing
Composite waterproofing & protection system on a structural concrete joint.

Case Studies

Featured Industrial Rehabilitation Projects

01

Compressor Foundation Rectification
PETROCHEMICAL

S-Chem

Compressor Foundation Rectification

2014

Rectification of a large compressor foundation and high-performance fireproofing. Structural stabilization was successfully executed under active plant vibrations, restoring structural integrity.

Applied SystemEpoxy Grouting & Fireproofing
Measured ImpactActive plant operations secured, zero downtime during execution
Jubail, KSA

02

Transformer Foundations & Firewall
POWER

Berry Gas Plant

Transformer Foundations & Firewall

2014

Rectification of two transformer foundations, fireproofing & firewall construction. Ensured structural protection and thermal shielding in extreme load utility environments.

Applied SystemStructural Concrete & Fire Wall
Measured ImpactThermal isolation and structural integrity fully restored
Jubail, KSA

03

Acid Sewer Pit Rehabilitation
INDUSTRIAL

SAFCO (IBB)

Acid Sewer Pit Rehabilitation

2015

Rehabilitation of concrete drainage pit and acid sewer system with specialized chemical-resistant epoxy coatings, preventing soil contamination and structure degradation.

Applied SystemAcid-Resistant Epoxy Coating
Measured ImpactSoil contamination eliminated, 100% acid isolation
Jubail, KSA
SABIC

04

Reactor CFRP Lining
MINING & ACID

Ma'aden PPC

Reactor CFRP Lining

2018

Emergency composite Carbon Fiber Reinforced Polymer (CFRP) lining on reactor PAP Train fume hood sleeve & roof during shutdown. Completed under tight deadline constraints.

Applied SystemFRP Composite Lining
Measured ImpactReactor lifecycle extended by 15+ years under 98% acid concentration
Ras Al Khair, KSA

#01

Completed

Large Compressor Foundation Remediation & Fireproofing

S-Chem
Jubail
April 2014 - May 2014

#02

Completed

Transformers Foundation Remediation, Fireproofing & Firewall Construction

Berry Gas Plant
Jubail
June 2014 - July 2014

#03

Completed

Acidic Drainage Network & Concrete Slabs Remediation

SAFCO (IBB)
Jubail
Dec 2014 - May 2015
SABIC

#04

Completed

20" Pipeline Repair using CFRP

SAFCO (IBB)
Jubail
August 2015
SABIC

#05

Completed

Sub-surface Pipe Trench Repair I 1012-G

SAFCO (IBB)
Jubail
October 2015
SABIC

#06

Completed

Engineering Study for Oily Water Trench Remediation & Reconstruction

Aramco (KJO)
Khafji
December 2015
Saudi Aramco

#07

Completed

Oily Water Trench Remediation

Aramco (KJO)
Khafji
March 2016 - Sept 2016
Saudi Aramco

#08

Completed

Structural Safety Analysis for Elevated Water Tank

Aramco (KJO)
Khafji
Nov 2016 - Jan 2017
Saudi Aramco

#09

Completed

CFRP Lining for Reactors (Columns, Roof, Pump Body & Cover)

Ma'aden PPC
Ras Al-Khair
May 2017 - July 2017

#10

Completed

Repair Works for 48" Cooling Water Line & 60" Feed Line

SAFCO (IBB)
Jubail
August 2017 - Sept 2017
SABIC

#11

Completed

CFRP Lining with Top Coat for Reactors - PAP C Line

Ma'aden PPC
Ras Al-Khair
Dec 2017 - Jan 2018

#12

Completed

Emergency CFRP Lining - PAP B Line

Ma'aden PPC
Ras Al-Khair
Feb 2018 - March 2018

#13

Completed

CFRP Lining Services - PAP A Line

Ma'aden PPC
Ras Al-Khair
June 2018 - July 2018

#14

Completed

Corrosion Protection using CFRP - PAP C Line

Ma'aden PPC
Ras Al-Khair
Dec 2018 - Jan 2019

#15

Completed

Additional CFRP Works - PAP C Line

Ma'aden PPC
Ras Al-Khair
April 2019 - May 2019

#16

Completed

Fiberglass Trench Restoration with Protective Coating

Saudi Irrigation Org (SIO)
Al-Ahsa
May 2019 - Dec 2019

#17

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
Dec 2019 - Jan 2020

#18

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2021

#19

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2022

#20

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2023

#21

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2024

#22

Completed

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2025

#23

Ongoing

Corrosion Protection using CFRP - PAP B Line

Ma'aden PPC
Ras Al-Khair
2026

Let's Build a More Reliable Future